BRASKEM LM 24-05-3349
Description
Job Description
Position Title : Scaffold Builder Lead
Position Reports To: Foreman
Position Summary
A Scaffold Builder Lead directs a crew in the Foreman’s absence and responsible for directing personnel in the safe execution of the site-specific scope of work items outlined in the contract documents. A ccording to sketches or blueprints, or while adhering to client, OSHA and company standards.
Essential Functions
-
Follow verbal directions as required to perform duties and responsibilities as listed below .
-
Heavy lifting will often be required to perform tasks .
-
Must be able to kneel, squat, and climb .
-
Must be able to perform required duties for extended periods of time .
-
Clean up of work area, supplies, materials, and equipment .
-
Communicate regularly with the Field Foreman with regard to issues and concerns on the job site .
-
Responsible for ensuring that work continues in the Foreman’s absence .
-
Comply with all Apache and client safety policies and programs .
-
Maintain a reliable attendance records
-
Always maintains a clean and safe work environment
-
Work unsupervised in an efficient and effective manner.
-
Able to wear all required PPE
-
Other duties as assigned
Education & Experience
-
Minimum 3-4 years of scaffold experience
-
Minimum 1 year experience with Apache.
-
Supervisory Experience (Preferred )
Knowledge, Skills, and Abilities
-
Able to give clear and concise instructions to multiple employees in the execution of work.
-
Possess the ability to maintain basic field equipment such as air compressors, man lifts, forklifts and etcetera.
-
Ability to interpret erection drawings.
-
Ensure that EVERY individual scaffold component is thoroughly inspected to verify good condition and integrity. Any defect encountered will require removal of services.
-
Ensure that all scaffolds are erected/dismantled in accordance with industry standards and manufacturer, OSHA, Apache and client’s recommendations/requirements.
-
Ensure that completed scaffolds are thoroughly inspected prior to tagging.
-
Update scaffold-tags at the beginning of each shift, or more frequently if required .
-
Transport materials to the site and erect the scaffold to the dimensions required
-
Utilize fall protection to secure yourself, tools and materials
-
Hammer material to each locking section
-
Erect scaffolding, install ladders, handrails, platforms, catwalks needed in order to access work area
-
Must maintain a positive attitude with crew members.
-
Ensuring good housekeeping is being performed throughout the entire project - inside & outside.
Work Conditions/Physical Demands
-
Remaining in a stationary position, often standing, or sitting for prolonged periods .
-
Light work that includes moving objects up to 20 pounds.
-
No adverse environmental conditions expected.
-
Must be able to work in high noise volumes, toxic or caustic chemicals, fumes, airborne particles, dusty conditions, hazardous machinery, precarious places, proximity to other employees.
-
Background Check Requirements
Drug Program
All employees at made aware that Apache has a comprehensive drug/ alcohol policy and program in place, which includes random testing